About Us
Products
Geosynthetic Installation Division
Photo Gallery
Case Studies
News
Contact Us
Photo Gallery
Home
/
Photo Gallery
Attenuation Pond Liner
Flex MSE
Industrial Bulk Stockpile Cover
Flex MSE
Temporary Cap
Peatland Restoration using RePeat matting – Rottal Estate. (750m)
Flex MSE
Flex MSE
Flex MSE
Flex MSE
Flex MSE
Flex MSE
Flex MSE
ReDam Blocks
RePeat Restoration Matting
Saltpile Cover
Industrial Bulk Stockpile Cover
Japanese Knotweed Barrier
Estate Management Solutions
Contaminated Soil Windrow Cover
Automated Pre-welded Panel fabrication machine
Chemically resistant tank bund liner
Attenuation Pond completed with GCL
Attenuation Pond Lining System
Attenuation Pond Liner – HBB 300 and 1mm HDPE
Attenuation Pond – HBB 300 and Power Scrim 750
Attenuation Pond – HBB 300 and Power Scrim 750, both supplied in pre-welded panels
Attenuation Liner fabricated into one pre-welded panel
Aquaponic Liner
Aquaponic Liner
Aquaponic Liner
Flex MSE being installed as a ‘green’ cladding to sheet piles
Attenuation Pond lining system
Attenuation Tank
Attenuation Pond – HBB 300 geotextile and 1mm HDPE
Flex MSE Culvert repair works on the banks of the River Clyde
Temporary Landfill Cap on an interphase slope
Flex MSE being installed on a new housing development, the system was installed to allow the gardens of two plots to be levelled
Attenuation Pond liner fixed to a headwall with stainless steel batten and neoprene strapping
Leachate well fixed to our temporary capping liner using a pre-fabricated top hat and HBB butyl tape
HBB 300 geotextile supplied and installed in one, pond specific sized pre-welded panel
Power Scrim 1000 installed in one, pond specific sized pre-welded panel for a habitat pond
Our Japanese Knotweed barrier supplied for a Network Rail contract
Levelling new housing plots with our Flex MSE vegetated wall system
Japanese Knotweed Burial Cell lined with our Power Scrim 600 Japanese Knotweed Barrier
120m long x 4m high retaining wall being built with our Flex MSE system to level off a large area of a development site
Temporary landfill cap installed on a stepped interphase slope
40 000m2 Net Down ballast system installation in the US
HBB installation team welding on an attenuation pond job
HBB 100 geotextile installed for a horse arena application, supplied in one, arena specific sized pre-fabricated panel
38 000m2 temporary landfill cap
Temporary capping liner fixed to gas well using a pre-fabricated top hat and HBB Butyl tape
Large Japanese Knotweed Burial Cell lined with our Power Scrim 600 Japanese Knotweed Barrier, supplied in one, cell specific sized pre-welded panel
A pre-fabricated panel of our HBB 300 geotextile being readied for shipment
A load of pre-welded panels of our Power Scrim 400 and Net Down ballast system being shipped for a temporary landfill capping job
Flex MSE Culver repair starting to vegetate
A completed settlement pond lined with our Power Scrim 1000, inert material placed on top of the liner